So, you’re daydreaming about that perfect pool oasis? Maybe your current inground pool has chipped tiles and faded plaster. You’re probably wondering how long it takes to renovate a swimming pool. It’s a common question, and there’s no one-size-fits-all answer. By the end of this post, you’ll have a clearer idea of what to expect for your pool remodel timeline. Check out our pool renovations in Montgomeryville, PA.
Factors Affecting Your Timeline
Many factors affect the renovation timeline. Pinpointing a precise timeline before examining the pool’s condition and project scope is impossible. However, common timelines for specific renovation aspects offer a general guide for your pool renovation project. Considering these factors is a good idea as you’re remodeling.
Pool Resurfacing: A Fresh Start
Resurfacing involves replacing the pool’s interior finish (plaster, pebble, or tile) and the waterline tile. A simple resurfacing job, without structural repairs, takes one to two weeks. This assumes no issues with weather, materials, or contractor availability. Plaster sometimes lasts 5–15 years between treatments, while pebble can last 15+ years.
Coping Repair: Addressing the Edges
Coping repair (the material around the pool’s edge) generally takes a few days for full replacement. Cracks in coping often stem from shifting earth pressure. Severe cracks need prompt fixing to prevent structural damage. The timeline depends on the coping material: stone, bullnose brick, or concrete. For larger pools or pools with complex designs it can sometimes require a couple weeks for coping repair.
Deck Replacement: Reimagine Your Pool Surroundings
Resurfacing the pool deck (painting or a new acrylic coating) takes only a few days. Depending on your pool patio, a total deck renovation (switching material or resizing) usually takes 1–3 weeks. Different decking options mean varying timelines.
A new acrylic surface often takes a week, while natural stone could take 2 to 3 weeks, depending on other factors. Re-topping existing decking takes less time than a complete replacement.
Equipment Upgrades: Boosting Efficiency
New pool equipment upgrades (pumps, filters, and heaters) are usually installed within one visit. . Experienced installers are crucial. Equipment interconnects with plumbing and electric systems, so these areas are best left to professionals. The majority of the timeline would consist of waiting for the specific equipment to be ordered.
Adding Features: Enhancing the Experience
Adding water features, shade structures, rock waterfalls, or spas is much more labor-intensive and increases the time needed. Depending on the feature, the time it takes to order supplies, the contractor’s schedule, and the weather, this adds from a few days to weeks.
Structural Repairs: Ensuring a Solid Foundation
Structural repairs involve fixing cracks or leaks. Patching minor damage takes a couple of days, but major repairs to the pool structure can take several weeks, depending on the damage.
If your renovation requires major demolition and construction, add extra time. Pool safety is paramount. Factor in 1–2 weeks for demolition and 1–3 weeks for reshaping. Deck replacement adds another 1–3 weeks, depending on whether you’re re-topping, replacing, or extending.
A Realistic View
A simple resurfacing, assuming no delays, takes anywhere from 1-2 weeks. However, even these projects become more complex when hidden issues arise. This is particularly true with older pools, adding features, and pool builders. Quality pool builders have extensive remodeling experience and will advise you of potential setbacks during the pool remodel.
Complete overhauls, especially for a luxury pool, can take 2–3 months. This includes the pool, deck, plumbing, new features (like waterfalls), tile installation, and equipment. Budgeting, permits, and consultations add time before work begins. Your remodeled pool should look great in photos, perfect for sharing with friends. You’ll enjoy your newly remodeled pool in no time.
Several variables influence the renovation timeline:
- Project Scope: Minor remodel (resurfacing, tile) vs. overhaul (deck expansion, water features).
- Structural Condition: Extensive repairs prolong timelines.
- Contractor Availability: Your contractor’s schedule impacts the timeline. Make sure to spend time with several pool contractors to see what factors affect their estimated pool renovation timeline.
- Material Availability: Delays occur if materials aren’t delivered on time.
- Weather Conditions: Weather delays extend the project. Plan carefully with pool renovation experts and look at when pool renovations occur more often based on historical data for your location.
- Unexpected Problems: Unknown issues often arise during renovations.
We can also help you open your pool in Bucks County and Montgomery County. Determining your renovation time depends on discussions with a professional pool contractor. They’ll provide a clearer timeline for your renovation project. Keep in mind weather can cause delays. Add buffer time to the timetable, maintaining flexibility for any surprises. Contact us today for more information.